City water records

Seattle public water system guide

Learn more about Seattle’s public water system. Explore records for SEATTLE PUBLIC UTILITIES, read its annual water quality reports, and follow links to official information.

Local Snapshot

Available Seattle water system context

One public water system profile is currently linked to Seattle. The system profile is the stronger data page; this city hub explains the connection and where to check next.

Associated systems1

One linked profile is shown here. Confirm address-level service with an official source.

Reviewed system links1

County or borough is not listed in the current city relationship record.

Primary PWSIDWA5377050

Use the PWSID when checking official sources.

Latest CCR2025

2025 report context is linked through SEATTLE PUBLIC UTILITIES; 11 summarized report entries are shown on the system profile.

Associated Systems

Public water systems linked to this city

Start with the linked system profile for Seattle; it carries the PWSID, report context, source links, and limitations. The city page is a navigation layer.

Last updated: EPA data

SEATTLE PUBLIC UTILITIES

PWSID WA5377050

View system profile

System-level profile for Seattle. Use it to review report-year context, source links, available violation records, contaminant relationships, and limitations.

System type
Communities
Seattle
Counties
County not listed
Latest CCR
2025

How to use this city page

  • Start with PWSID WA5377050 when checking official records.
  • Open the system profile before relying on city-level context.
  • Use the linked annual report and source links for report tables, definitions, and official wording.

Location context: County or borough is not listed in the current city relationship record.

City pages help organize nearby records, but the water system profile is the main record page. A city may have more than one provider, and service areas may not match city limits.

Seattle water guide

Find the right Seattle water help

Start with the provider named on your water bill. SPU supplies water directly and also sells water to other utilities; receiving Seattle’s regional water does not necessarily make SPU your retail provider.

See SPU’s source and treatment details

Official sources reviewed September 16–17, 2026. Annual reports and water sample results describe their stated periods; this is not a live alert service.

Service area

Confirm your retail provider

SPU’s wholesale customer list names separate utilities, including Cascade Water Alliance, the City of Mercer Island and Highline Water District. The list directs those customers to their own utility for service and billing. It is not a list of properties served by SPU.

The official water and sewer research map supports parcel searches. SPU says it is for preliminary planning, omits some infrastructure and may show mains that cannot accept a new connection. Confirm service with your bill, account or the utility.

The map application presents terms before use. Its landing page and utility contact path were reviewed; an address search beyond those terms was not verified.

For a boundary overview, the 2019 plan's service-area mapseparates Seattle's retail area from wholesale customer areas. It is a historical planning map, not an address-level service guarantee. The state GIS record reviewed for system 77050 has a 2016 update and no source date; a newer authoritative boundary has not been verified here. Confirm service with SPU.

See the regional utility directory and service-area evidence.

Customer support

Choose the contact for your question

Urgent water concerns

SPU’s 24-hour Operations Response Center handles no water, discolored water and odor concerns.

206-386-1800

Water-quality questions and reports

Ask about chlorine, fluoride, hardness, testing or water-quality reports. Hours are not specified on the reviewed water-quality page.

206-615-0827

Accounts and interpretation

Customer Service: Monday–Friday, 7:30 a.m.–6 p.m. The 2025 report directs interpretation requests to this number.

206-684-3000

Water infrastructure serving a parcel

The Development Services Office can help interpret the water and sewer research map. Ask about the specific parcel; a mapped main does not establish a service connection.

206-684-3333

Sources: SPU water-quality concerns, contact directory, map guidance and 2025 report, physical page 11. Interpretation support does not establish that a translated or accessible report file is available.

Water supply

Where SPU’s water comes from

The 2025 report identifies the Cedar River and South Fork Tolt River watersheds and a report-year source mix of 62% Cedar and 38% Tolt. That is regional context, not an address-level source assignment.

Read the source and treatment context

Lead & testing

Lead information and customer testing

Use SPU’s water service-line map to search an address, zoom to the property and select a service line. The map describes only the portion maintained by SPU; its material information does not apply to pipes on private property. For service-line questions, its published contact is 206-684-5800. An absent line is not proof of no service.

SPU’s lead information page links to its service-line research map and Washington’s certified-laboratory directory. A system summary cannot establish the material in your property’s service line or plumbing.

The monitoring-results page says customers enrolled in Seattle’s Utility Discount Program can access free lead testing by calling 206-615-0827. Ask the lab for collection instructions and eligibility confirmation before collecting a water sample.

Other customers can use the certified-laboratory directory linked by SPU. Its lead page lists a $25–$50 analysis range and directs customers to confirm current prices and water sampling procedures with the laboratory. SPU says its lab is not set up for high volumes of residential lead water samples.

The 2025 report’s lead and copper results describe water samples from 52 homes, not every household. This page does not infer a property’s result or reproduce the utility’s broad safety claims.

Historical lead components and replacement policy: 2019 plan

The 2019 plan, printed pages 3-25–3-26, describes short lead “whips” or “goosenecks” joining some galvanized services to water mains. It estimated 1,000 services with lead whips, whose locations were unknown within about 4,000 galvanized services of the relevant age, out of approximately 9,000 galvanized services overall. These historical estimates are not today's service-line inventory.

At that time, SPU described removing a whip when replacing a service for another reason or discovering the whip, and discussing the resources and time needed for proactive galvanized-service renewal. This was not a published completion schedule, customer eligibility rule, or promise to replace a particular property's pipe.

The submitted inventory covering both utility- and customer-owned portions, current category totals, and any current replacement plan have not been recovered from the reviewed public sources. Ask SPU which material record covers each portion of your service and whether inspection or replacement is scheduled. The public map alone does not answer those questions.

Monitoring history

Historical monitoring disclosures

2024: SPU’s annual report describes a June 21, 2024 Cedar Treatment Facility monitoring violation: equipment did not record part of the data for one of seven operating UV units. The report describes other treatment data, equipment repairs, programming changes and staff training. This is a historical disclosure, not a current advisory.

2023: The Tolt bromate footnote says an October water sample was not analyzed and SPU could not be sure of water quality during that period. The table’s printed “Passed!” marks must be read with this monitoring gap.

2022: The report lists one E. coli-positive water sample out of 3,331. It repeats the same distribution-system count under Cedar and Tolt; it is not two separate positive water samples. The report says repeat water samples did not detect either compound and describes report-period compliance.

2021: The radium-228 footnote says an initial slight detection was followed by water samples with no detections.

Sources: 2024 report (physical page 7), 2023 (page 9), 2022 (page 5), and 2021 (page 8), linked in the archive below. These report disclosures are not a complete state enforcement history.

Read the complete system report tables and notes
EPA's separate five-year lead/copper view and report differences

The EPA ECHO view retrieved September 17, 2026 lists the following annual periods in mg/L. They are source labels, not proof that independent water samples were collected every year. The annual reports above retain their own actual testing years.

Compare all six federal entries with the report history

The federal copper row says “No data records returned,” although SPU's annual reports contain copper results. Federal 2023–2024 lead values and annual-period labels also differ from the reports' repeated 2022 testing results. These views have not been reconciled, so they are not combined into a trend. A blank or “--” does not mean zero, no testing, or no violations. The displayed action levels belong to this source snapshot, not a statement of current legal requirements.

Regulatory records

Regulatory history and survey records

Annual-report monitoring disclosures above, state regulatory decisions, and federal enforcement records have different dates and purposes. None is a live advisory feed. The reviewed public sources do not yet provide a reconciled state violation history or the underlying text and correction record for the 2023 storage finding below.

Sanitary surveys: 2021–2025

EPA ECHO's public survey table, reviewed September 17, 2026, contains nine state surveys. Eight list N in all 11 categories. The November 15, 2023 survey lists S for Finished Water Storage and N for the other ten categories. EPA defines S as “Significant Deficiencies” and N as “No Deficiencies or Recommendations.”

These are dated survey findings, not contaminant test results or a current advisory. The listing does not identify the affected storage facility, describe the deficiency, or supply its corrective-action closeout. Later N results do not by themselves prove that specific finding was resolved.

Review all nine surveys and 99 category results
Earlier visits, a separate EPA desk audit, and record limits

EPA's ten-year monitoring view additionally lists state “Sanitary Survey, Complete” visits on July 19, 2016; July 18, 2017; August 8, 2018; and November 14, 2018. The five-year category table does not supply findings for those four earlier visits.

A June 15, 2023 EPA ICIS entry is an “Offsite Record Review” / “Desk Audit,” with no finding displayed. It is not an additional sanitary survey. The SDWA compliance summary says current as of March 31, 2026 and last refreshed July 9, 2026; no separate survey-refresh date is shown.

Read EPA's survey definitions with the entries. The window label does not establish a complete survey history. Blank, not evaluated and N are different outcomes.

Earlier treatment and monitoring events described in the 2019 plan

The 2019 plan, printed page 3-5, describes a Tolt treatment-technique violation involving 17 minutes of elevated turbidity in 2015 and a missed bromate water sample in 2016. These precede the separate October 2023 missed analysis and June 2024 Cedar UV monitoring disclosure. The plan's report-period compliance language is not a conclusion about current conditions.

The exact-PWSID EPA snapshotretrieved September 16, 2026 contains violation ID 2010361 with a compliance-period start of December 1, 2015 and a return-to-compliance field dated January 26, 2016. The extract leaves the period end blank. That record has not been conclusively matched to the plan's event or reconciled with state records; its return date is not a system-wide current-compliance determination.

What is still needed from the state

Public DOH maps, EPA extracts, the five annual reports, the 2019 plan and its inventory, monitoring and capital appendices did not supply the underlying survey finding, correction closeout, effective treatment decision, or reconciled enforcement history. Contact the DOH engineer listed below for those public records.

A missing survey here does not mean a survey never occurred or that no deficiencies were found. Ask DOH for the survey date, public findings and any dated corrective-action closeout.

Read the report-period monitoring context alongside the complete tables

Treatment

Corrosion control and household plumbing

SPU’s Cedar facility description says lime raises pH to a target of about 8.2 to make water less corrosive to building plumbing. At Tolt, lime increases alkalinity and carbon dioxide adjusts pH; SPU describes water leaving the plant at pH 8.2 and alkalinity 19 mg/L.

These are utility operating descriptions retrieved September 16, 2026, not a new laboratory result or a dated state treatment-approval decision. Treatment does not identify the materials or lead level at an individual tap. Lead/copper report rows keep their actual testing years: 2019, 2022 and 2025.

Watershed protection

Source assessment and watershed protection

Washington DOH’s Source Water Assessment Program map identifies state system 77050 as Seattle Public Utilities. Its Cedar River (01) and Tolt River (02) watershed records both list active, permanent surface sources and “High” susceptibility. Both records carry an update of March 16, 2026.

The annual report explains that Washington assigns surface waters this rating regardless of whether contaminants have been detected. Susceptibility is not a water-test result. The source-effective field is January 1, 1970; it does not establish the assessment date.

SPU’s Tolt watershed page describes a management plan approved in 2011, with road, aquatic-habitat and forest-management work. Its historical ownership description is 70% City and 30% national forest. Those watershed figures do not describe retail service boundaries.

SPU’s 2019 Water System Plan describes Cedar’s Limited Alternative to Filtration designation (chapter 3, page 3-5). This historical account does not establish a currently effective waiver, its expiry, or a new state decision.

Infrastructure

Storage, seasonal operations and conservation

SPU’s reservoir page describes six covered reservoirs: Magnolia, Lincoln, Myrtle, Beacon, West Seattle and Maple Leaf. It says Roosevelt and Volunteer are disconnected from the drinking-water system and retained as emergency resources, including firefighting.

In its April 8, 2026 supply update, SPU described refilling mountain reservoirs earlier than normal in response to low snowpack, while retaining space for spring rainfall. Its September 14 update describes managing releases for water supply and fish habitat.

These are dated operational accounts. Check that live supply page for current instructions and Saving Water Partnership for conservation guidance. Neither an earlier forecast nor this page establishes today’s restriction stage.

The 2025 report, physical page 6, records 46.2 billion gallons produced and 2.08 billion gallons lost to leakage (4.5%). Saving Water Partnership members used an average 97.9 million gallons per day, against their stated goal of less than 110 million gallons per day. Partnership demand covers the member utilities; it is not SPU retail demand. Earlier annual production and leakage figures remain with each year's report notes.

That report also marks 25 years of the Cedar River Watershed Habitat Conservation Plan, launched in 2000 for a 50-year term. It describes habitat restoration, wildlife monitoring and river-flow management for fish and other wildlife. These are source-protection activities, not contaminant measurements or proof of current treatment performance.

Compare the 15 historical reservoir records and their dates.

School water

School testing is a separate record

Washington DOH’s school lead program links results from 2018–2020 and from 2022 onward. Its May 2026 update describes a five-year retesting cycle beginning July 1, 2026 and ending June 30, 2031 for qualifying school buildings.

School results concern a specific outlet, building and collection date. They are not interchangeable with SPU’s residential lead/copper monitoring or Cedar/Tolt entry-point results. No school result is assigned to this system here without a verified provider relationship. Families can use the program’s results and the school’s action plan for that building.

Water characteristics

Hardness history: 2020–2026

SPU labels these quarterly surface-water analyses “Non-regulatory data. Informational only.” The 14 linked reports contain 56 location/date observations. Calcium hardness is not total hardness. The separately printed “Hardness, Grains” values are preserved in grains/gallon; they are not conversions calculated here.

CLT-5 and M-1A are the Cedar columns; TPT-3 and B-2 are the Tolt columns. These locations do not predict a household result. The archive has gaps; it is not a continuous quarterly series.

Look up all 56 hardness observations by report date and location

May 2026 prints 0.50 grains/gallon at TPT-3; May 2025 prints 0.52 at B-2. These and the other source values are retained literally. Their relationship to the calcium-hardness columns needs utility clarification before combined interpretation. No household classification, trend, or softener setting is inferred. Sources retrieved September 16, 2026.

Capital investment

Water capital projects: September 16, 2026 snapshot

SPU’s official project map returns 15 Water-category polygon records. Names and statuses below are the map’s labels; similarly named rehabilitation records are retained separately. “Active” does not establish work on your street today, and “Substantially Completed” does not mean every closeout task is finished.

Review the 15 water-project records

The queried records have no individual project-page URL. Their scheduled dates have not been treated as completed work. Use the map and water-repair notices for location-specific updates; this is not a complete street-work inventory.

The 2025 annual report, physical page 5, describes a major pipeline upgrade between Volunteer Park and Maple Leaf Reservoir and work to replace the 21-million-gallon Bitter Lake reservoir while expanding the adjacent park. These are the report's project descriptions, not independently verified completion dates. Its approximately 1,900 miles of water pipes is a report-period network description.

How the longer-term capital plan fits these projects

The 2019 Water System Plan describes renewal of aging distribution assets and earthquake resilience as investment priorities. Its capital-facilities appendixcombines an adopted 2018–2023 program with later estimates through 2040. Planned spending and construction dates in that historical plan do not establish today's adopted budget, completed work, or a shutdown at your address.

Additional support

State contacts, language help and record limits

For a drinking-water regulatory question beyond the utility’s response, Washington DOH’s county contact directory lists Laura McLaughlin for SPU at 564-669-0753. Explain the issue and ask which state process applies. This directory entry does not establish a formal complaint appeal or a response deadline.

SPU’s 2024 annual report (physical page 13) prints an interpretation-services contact: 206-684-3000. Ask for the language and report year needed, or for an accessible format. A translation phone line is not evidence that a particular translated or accessible PDF is already available.

State enforcement detail, current treatment determinations, sanitary surveys and a dated inventory covering both public and private service-line portions remain separate evidence needs. Missing records here do not mean no violations, no lead service lines, or no replacement obligations.

How SPU handled complaints in its 2019 plan

Printed page 3-19 (physical page 101)describes routing water-quality concerns and high-priority problems from the call center or after-hours Operations Response Center to an inspector for investigation until resolved. SPU logged and mapped complaints to identify patterns. This historical process does not establish a current response deadline or formal appeal right.

For a concern now, use SPU's current 24-hour response number,206-386-1800, for no water, discoloration or odor; use 206-615-0827 for general chlorine, fluoride or hardness questions. Describe the location, timing and observed problem. Ask SPU how to check progress on the case.

Rates & assistance

Residential water rates: 2025–2026

SPU bills include a monthly meter charge and a water-use charge. Match your provider, meter size, customer class and billing area before using these schedules. They do not calculate a total bill or describe rates charged by other utilities receiving SPU water.

Source: SPU Residential Drinking Water Rates, reviewed September 17, 2026. Amounts are U.S. dollars. One CCF is 100 cubic feet, or 748 gallons, as defined by SPU.

For the most common residential meter size, 3/4 inch or less, SPU lists these monthly base charges through December 31, 2026. Water use is charged separately.

Inside Seattle
$21.35 / month
Outside Seattle
$24.35 / month
Shoreline & Lake Forest Park*
$25.90 / month
Burien
$26.45 / month
Compare all 2025 and 2026 meter charges and usage tiers

* SPU says the Shoreline and Lake Forest Park column applies to customers in those cities, not water districts. Its master-meter footnote also excludes developments that pay Public Utility Tax directly to Washington State.

Utility Discount Program: eligibility and application

SPU’s Utility Discount Program lists a 50% SPU bill discount and a separate 60% Seattle City Light discount. Homeowners and renters can apply. The source lists a City Light and/or SPU bill in the applicant’s name; tenants whose landlord pays utilities may still qualify for financial help.

The 2026 income table applies to gross household income in the one-month period before applying. SPU says income must be below the listed threshold. These are eligibility limits, not an approval or a calculation of benefits.

All 2026 household income thresholds
1 household member
Gross monthly income
$4,269
Gross annual income
$51,228
2 household members
Gross monthly income
$5,582
Gross annual income
$66,984
3 household members
Gross monthly income
$6,895
Gross annual income
$82,740
4 household members
Gross monthly income
$8,209
Gross annual income
$98,508
5 household members
Gross monthly income
$9,522
Gross annual income
$114,264
6 household members
Gross monthly income
$10,836
Gross annual income
$130,032
7 household members
Gross monthly income
$11,082
Gross annual income
$132,984
8 household members
Gross monthly income
$11,328
Gross annual income
$135,936
9 household members
Gross monthly income
$11,575
Gross annual income
$138,900
10 household members
Gross monthly income
$11,821
Gross annual income
$141,852
Each additional household member
Gross monthly income
$247
Gross annual income
$2,964

Use the Utility Assistance Program application or the printable application. SPU says applications are reviewed before enrollment. For application help and interpretation, contact 206-684-0268 or [email protected], Monday–Thursday, 7:30 a.m.–3 p.m.; TTY/TDD: 206-233-2778. If contacted about renewal, SPU says to call rather than complete another online application.

The reviewed page provides program explanations in English, Spanish, Chinese, Vietnamese, Somali, Korean and Amharic. It says the online form is in English and interpretation is available by phone. This does not establish translated annual water reports.

Credits when the property owner or HOA pays SPU utilities

UDP customers whose SPU services are paid by the property owner or condominium HOA, but who receive a City Light bill, may qualify for monthly credits on that electric bill. Water, sewer and drainage credits are effective January 1, 2026; garbage and yard-waste credits are effective April 1, 2026. The separate service categories below are billing credits, not water charges or water-quality findings.

Single-family
Water / month
$25.36
Sewer / month
$43.39
Drainage / month
$29.45
Garbage / month
$23.25
Yard Waste / month
$7.55
Duplex
Water / month
$25.36
Sewer / month
$43.39
Drainage / month
$14.72
Garbage / month
$23.25
Yard Waste / month
$7.55
Multi-family
Water / month
$14.19
Sewer / month
$30.27
Drainage / month
$3.15
Garbage / month
$18.95
Yard Waste / month
$7.55

For an immediate past-due balance, SPU directs customers to its emergency assistance program. Check that program’s eligibility separately; UDP enrollment does not by itself establish an emergency-assistance award.

Eligibility, credits, application and language-help descriptions: SPU Utility Discount Program, reviewed September 17, 2026. This page does not collect application information or determine eligibility.

Service updates

Outages and local work

Outages and water-main work

Use SPU’s water-outage page for its map, planned-outage guidance and links to official boil-water instructions. A water outage or construction project is not itself a water-quality advisory.

SPU’s water-repair page describes maintenance and links to current and completed projects. This site does not maintain a complete live outage or construction list.

Public participation

Who runs the utility and how to participate

The January 22, 2018 state inventory formidentifies system 77050's owner as Seattle, City of. The 2025 report states that SPU operates the Tolt facility as of 2026, following private operation. The 2019 plan's former contractor arrangements are historical; they do not establish today's complete operator contract roster.

Seattle retail utility oversight

The City Council Governance & Utilities Committeecovers SPU finances, rates, operational policies, regional matters and the Utility Discount Program. Its September 17, 2026 page lists regular meetings on second Thursdays at 9:30 a.m. Check theCouncil calendarand the specific agenda for changes and access details.

The Council's public-comment instructionsaccept written comments at [email protected]and explain in-person and remote registration. Comments must concern an agenda item or committee business. Request accessibility or language accommodations through the linked City Clerk process. Meeting comments are not an urgent water-service request.

Regional water-supply decisions

The Seattle Water Supply Operating Boardprovides advice, direction and limited authority over regional supply matters. Its page provides agendas, minutes and a contact for older records; it lists meetings typically on first Thursdays, 1–3 p.m., with exceptions. This wholesale body is distinct from retail Council oversight and from the customer-service process at your utility.

Annual reports

Find Seattle’s earlier annual reports

SPU’s official archive lists 2021–2025 reports. All five files were retrieved again on September 16, 2026 and matched the previously preserved checksums. The historical reports below are official documents; their all 63 result rows across these five reports appear on the system page, with separate Cedar/Tolt values and report-period notes.

Review all SPU report rows and historical tables

Unregulated monitoring

2023 PFAS and lithium monitoring

EPA’s July 2026 UCMR 5 release contains 240 results for Seattle Public Utilities: 29 PFAS analytes plus lithium, which is not PFAS. The records cover the Cedar and Tolt treatment-facility entry points, with 120 results for each.

What the results say

Every analytical sign is “<” and every numerical-result cell is blank. Each result is below its analyte-specific minimum reporting level (MRL); a blank is not zero. MRLs describe laboratory reporting, not health-based limits.

Keep the water sample dates

Collection dates run from March 14 to December 18, 2023. Event SE1 includes March and July collections; SE3 includes September and October. The individual dates below take precedence over treating an event as one date. These are entry-point results, not household testing or a current compliance finding.

Review all 240 SPU monitoring results

Source: EPA UCMR occurrence data, July 2026 release, retrieved September 16, 2026; exact PWSID WA5377050. SPU’s PFAS information also discusses older emergency-well testing; those well results are a separate water-source context and are not combined with these finished surface-water records.

Annual Reports

Latest report context in available data

Annual reports summarize a reporting period. For Seattle, use the linked system profile and official source before treating city context as complete.

WA5377050

SEATTLE PUBLIC UTILITIES

2025 report: The 2025 report link is available for SEATTLE PUBLIC UTILITIES. Use the linked source report for the full table, definitions, footnotes, and official context. This page includes summarized entries from the available report. They are not a complete copy of the report table.

Source type shown in available records: Utility report

What To Check Next

Next steps for Seattle water information

Use these links to move from local context to system, report, source, and limitation context.

Evidence

Official sources and methodology

Location context

County or borough is not listed in the current city relationship record. Use the linked system PWSID and official source instead of inferring a service area from a city boundary.

Evidence

Sources to confirm next

Use official federal, state, utility, or report sources before treating a page as final.

Opens in a new tab